PM-KUSUM Solar Agricultural Pumps
Up to 60% total subsidy (30% Central Government + 30% State Government) on solar agricultural pumps, with farmers contributing only 10% and the remaining 30% available via bank loan.
Independent directory · Reviewed March 2026 · The scheme authority determines eligibility
IS THIS FOR YOU?
Eligibility at a glance.
- Individual farmers owning cultivable agricultural land
- Farmer Producer Organizations (FPOs), Water User Associations (WUAs), and Primary Agricultural Credit Societies (PACS)
- Must have verified water source (borewell, open well, farm pond)
- Applicable for standalone diesel pump replacement or grid pump solarization
The details, when you need them.
About the scheme
PM-KUSUM de-dieselizes India agricultural sector and provides water and energy security to farmers by subsidizing standalone off-grid solar agricultural pumps and solarizing existing grid-connected agricultural tube wells.
Ministry of New and Renewable Energy (MNRE) · State Renewable Energy Development Agencies & DISCOMs
Benefits and assistance levels
Component B (Standalone Solar Pumps): 60% Total Subsidy
30% Central CFA + 30% State Subsidy for individual farmers in off-grid areas. Pump sizes: 3 HP, 5 HP, 7.5 HP.
Component C (Solarization of Grid Pumps): 60% Total Subsidy
Solarize existing grid-connected agricultural pumps. Farmers can sell surplus solar power back to DISCOMs at pre-fixed tariffs.
North-East & Himalayan States: 80% Total Subsidy
50% Central CFA + 30% State Subsidy in Himachal Pradesh, Uttarakhand, J&K, Ladakh, and NE States.
Who is excluded?
- Land without documented agricultural title records
- Dark-zone or over-exploited groundwater blocks without Micro-Irrigation (drip/sprinkler) setup
- Commercial industrial farming units
How to apply
1. Apply on State Renewable Energy Portal
Visit your respective State Nodal Agency portal (e.g. HAREDA in Haryana, UPNEDA in UP, RREC in Rajasthan, or MSEDCL in Maharashtra) and select PM-KUSUM Component B or C.
2. Submit Land Records & Water Details
Enter Aadhaar, land khasra number, pump capacity requirement (3HP / 5HP / 7.5HP), and water depth details.
3. Pay 10% Farmer Share
Upon verification of documents, deposit the mandatory 10% beneficiary share through the state nodal agency designated portal.
4. Installation & Joint Commissioning
Empanelled vendors install the solar panels, controller, and DC submersible pump; nodal agency conducts joint inspection and issues commissioning certificate.
Can farmers earn extra income from PM-KUSUM Component C?
Yes. Under Component C (Feeder Level Solarization), farmers use solar power to irrigate crops during the day and export surplus solar power back to the local DISCOM, receiving tariff payments directly into their bank accounts.
What pump sizes are available under PM-KUSUM Component B?
Subsidies are provided for standalone solar water pumping systems up to 7.5 HP capacity. Systems higher than 7.5 HP can be installed, but the subsidy is capped at the 7.5 HP rate.